An insight in the construction activities for building water supplying in the village Ljuboten |
Friday, 07 December 2018 13:50 | |||
Today the Mayor of Municipality Shtip, Blagoj Bochvarski together with the director of PE “Isar”, Zhivko Tasev inspected the construction of a water supply system for the residents of the village Ljuboten. This is about a new water supply line of 900 meters and reconstruction of a reservoir. The contractor of this activity is “Kole Transk” and the same will cost 730.000 MKD with VAT, of which 450.000 MKD are from the Bureau for balanced and regional development, and the rest from the Municipality of Shtip.
„Today we are in the village of Ljuboten, a relatively small village does not have certain problems that we announced from the pre-election that will be re-elected. There are about 25-30 residents but there are also residents who come here.
So far, there was an old water supply system that was out of function with many problems and that’s why we entered into the realization of a new plumbing together with two connecting shafts together with one tank.
The whole investment is 730.000 MKD of which part are provided from the Bureau for regional and balanced development” said Mayor Bochvarski.
|